Dalby Trunk Water Mains
Baker Rossow’s involvement in this project consisted of detailed design and construction supervision of 5.5km of DN450 PE trunk potable water mains and 5.5km of DN150 DI bore water mains between Dalby WTP and Dalby Township via Moonie Highway. The scope of the project included horizontal and vertical water main design, restraint jointing design for the DI pipework, numerous trenchless pipeline installations through creek crossings and state-controlled roads and aerial pipeline connections to the water treatment plant with associated structural supports.
Address: Moonie Highway, Dalby
Client: Chris Buckley Plumbing and Civil
Services Provided: Detailed Design and Construction Supervision
